  1. Overview
  2. Concepts
    1. Tasks and schedule data
    2. How a Kanban board is built
    3. How a Gantt chart is built
    4. Milestones and the calendar
  3. How to use it
    1. When and why
    2. Create a Kanban board and run it
    3. Add existing tasks to a board
    4. Build a Gantt chart with dependencies
    5. Link tasks with a dependency
    6. Update progress on a Gantt chart
    7. Keep the calendar and dates current
    8. Set the countdown clock
    9. Worked example: the CubeSat EO-1 demo
    10. Tips and good practice
    11. Common mistakes
    12. How it connects
  4. Project Management page
    1. Page header
    2. Calendar card
    3. Upcoming Events card
    4. Board Progress card
    5. Countdown Clock card
  5. Creating a chart
    1. Charts page
    2. Dashboard chart types
  6. Trends
  7. Chart editor
  8. XY Plot
  9. Kanban Board
    1. Toolbar
    2. Columns
    3. Cards
    4. Data export
  10. Gantt Chart
    1. Toolbar
    2. Chart
    3. Critical path
    4. Data export
  11. Calendar chart
    1. Calendar settings
    2. Add an event
    3. Day tab
  12. Keyboard shortcuts and gestures
  13. Messages
  14. Limits
  15. Related pages

Overview

Plan → Project Management is where you plan and track the project's work. The page has:

  • a Calendar of every dated Task, milestone and board column,
  • Upcoming Events, Board Progress and a Countdown Clock,
  • links to every Kanban Board and Gantt Chart in the project, and + New ▾ to create one.

Boards, Gantt charts and calendars are charts. Each chart is a root entity in the database with a chart label (Kanban Board, Gantt Chart or Calendar). Project Management lists and creates them; Plan → Charts holds the other charts: XY plots, risk burn-downs and saved matrices.

Tasks are ordinary model entities. So one Task can sit on a board, appear on a Gantt chart, mitigate a risk and trace to the requirement it serves.

Baselines & Versions and Reviews are in Control & Reviews; see Baselines & Versions and Reviews. Presentations has its own page: Presentations.

Concepts

Tasks and schedule data

A Task is an Action used for project work. These attributes hold its schedule:

AttributeTypeUsed by
Planned StartDate and timeWhen the task was planned to begin (LML 2.0). The Gantt Chart marks it with a dashed tick on the task's row, so a late or early Start shows against the plan.
StartDate and timeGantt bar start, calendar. Required for a Gantt row.
DurationNumber and unit (Seconds, Minutes, Hours, Days, Weeks, Months, Years)Gantt bar length. Required for a Gantt row.
Percent Complete0–100Gantt progress fill, card progress bar, Upcoming Events.
Due DateDate and timeCard due line, Gantt due marker, Upcoming Events, calendar.
Estimated Date of CompletionDate and timeGantt Estimated Date of Completion column (Start + Duration when empty).
FinishDate and timeCalendar.
StatusOpen, In Progress, In Review, ClosedCard status chip.
PriorityLow, Medium, HighPriority chip on Kanban cards (LML 2.0). A task without a value shows its High, Medium or Low label instead; the labels keep working.
AssigneePerson or teamCard, Upcoming Events, sorting.

Kanban cards are Tasks. Any Action with a Start and a Duration can be a Gantt row.

How a Kanban board is built

  • The board is a Task (the root), labeled Kanban Board.
  • Each card is a Task that the board is decomposed by. The Task can sit directly under the board or further down, to the chosen number of levels.
  • The columns are the values of one enumeration attribute of the cards: Status by default, the attribute a class workflow watches, or Board Column, an attribute Holarch adds to Task for boards with their own column names. A board can show all of the values or some of them, in its own order.
  • A card sits in the column of its value. Moving a card sets the value.
  • Cards without a value, or with a value that has no column on this board, sit in a last column named after the attribute, such as No Status.
  • A column's colour is the colour of its value, set in the Schema Editor.

Boards made before columns were attribute values (each column was a Time entity labeled Kanban Column, and each card was scheduled by a column) are converted when the project opens:

  • Columns named like the Status values (To Do and Done count as Open and Closed) become Status columns, and each card gets the Status of its column.
  • Other boards use Board Column, with the column names as its values.
  • Values the cards already have are never overwritten. A Status board whose cards hold other Status values uses Board Column instead.
  • A single Undo takes back the whole conversion. The old column entities and their links stay in the project until you delete them.

How a Gantt chart is built

  • The root is a Task, labeled Gantt Chart.
  • The chart shows the root's decomposition: its children, and their children down to the chosen number of levels.
  • Each row is an Action with both Start and Duration. Rows are sorted by Start within each level and indented by level.
  • Children without Start or Duration are listed below the chart as not shown.

A dependency is a depends on relationship from the dependent task to its predecessor, as on the Timeline. Two relationship attributes say how they line up:

  • Type: FS (the dependent task starts when the predecessor finishes; the default when empty), SS (both start together), FF (both finish together) or SF (the dependent task finishes when the predecessor starts).
  • Lag: a duration added between the two ends. A negative lag lets the dependent task start early.

An arrow turns red when the dependent task's end comes earlier than the predecessor's end plus the lag allows: Violated: the dependent task comes earlier than its predecessor allows.

Older projects and imports may hold Dependency entities that link two tasks through has dependent. When the project opens, each one becomes a depends on relationship with the matching Type, and a single Undo takes it all back; the Dependency entity stays until you delete it.

Milestones and the calendar

A milestone is a Time entity labeled Milestone with a Start date. Relate it to the task it ends with occurs.

A Calendar chart shows the chosen date attributes (Start and Due Date for a new calendar) of the entities a query matches. By default these are the Tasks, milestones and board columns (class:Task OR label:"Kanban Column" OR label:Milestone); a calendar can use any project query from the Database instead.

How to use it

When and why

Start planning once the work is known well enough. That is typically after the requirements baseline, when the architecture names the subsystems and the verification plan names the tests.

Each part answers one question:

  • Kanban board: what is being worked on, and by whom?
  • Gantt chart: when does each phase finish, and what drives the end date?
  • Calendar, Upcoming Events and Countdown Clock: what is due next?

Keep risk mitigations, test campaigns and review actions as Tasks here. Their dates then feed risk burn-downs and reviews.

Create a Kanban board and run it

  1. Open Plan → Project Management.
  2. Choose + New ▾ → Kanban Board….

    You see New Chart with Kanban Board selected.

  3. Choose the Columns: Task Status: Open, In Progress, In Review, Closed (the default), a class workflow that watches another attribute, or Own columns (the Board Column attribute) with the values you type, separated by commas (default To Do, Doing, Done).
  4. In Root Task, type a name, such as Engineering Board.
  5. Click Create.

    The board opens with its columns.

  6. Click + Task (or + Task at the foot of a column).
  7. Pick the Column, and enter a Number and a Name. Description, Start and Duration are optional.
  8. Click Create.

    The card appears in that column.

  9. Select the card. In the inspector, set Assignee, Due Date, Percent Complete and Status.
  10. Drag the card to the next column as work progresses.

Moving a card sets its value, and a single Undo takes it all back. When a workflow in Schema → Workflow watches the board's attribute, its transitions apply: a move it does not allow is refused with The Task workflow has no transition from “In Progress” to “Closed”. Add one in Schema → Workflow, or move the card to another column. A workflow without transitions allows every move.

To change the columns, choose Board ▾ → Edit columns…:

  • Columns are the values of picks the attribute (any Task enumeration, or Board Column).
  • Tick the values to show as columns, and order them with ↑ and ↓.
  • Type a New value and click Add value to add a value to the attribute.
  • A WIP limit marks a column with more cards than the limit: it is outlined in red and says Over limit.

Board ▾ → Swimlanes groups the cards in rows by Assignee, Parent task or Milestone (a Time item labeled Milestone that the task is related to). A move changes only the column.

To tune the view, use Board ▾ (Full or Compact cards, manual order or Sort by due date) and the level selector. Type in Filter cards to hide the cards that do not match. Board ▾ → Open as table lists the board's tasks in the Database.

Add existing tasks to a board

Choose Board ▾ → Add existing task… to add a task you already have. Without a value, it joins the first column.

Build a Gantt chart with dependencies

  1. On Project Management, choose + New ▾ → Gantt Chart…. (On the Charts page, click + New Chart and choose Gantt Chart.)
  2. In Root Task, type a name for the schedule. To chart an existing work breakdown, pick its top task from the list instead.
  3. Click Create.

    The empty Gantt chart opens.

  4. Click + Task.
  5. Enter a name, a Start (required) and a Duration (default 1 Days).
  6. Click Create.

    A bar appears for the task.

  7. Repeat steps 4–6 for each phase.

To chart a task that already exists, click Add existing task…. If it lacks a Start or Duration, Holarch asks for them: Each task on a Gantt Chart needs a start.

  1. Point at the predecessor's bar. A small circle appears at each end.
  2. Drag from the end you want to link to the start or finish of the dependent task's bar.

    The pair of ends gives the Type: finish to start is FS, start to start SS, finish to finish FF, start to finish SF. An arrow joins the bars, and the Dependency tab of the inspector shows the relationship.

  3. To change it, choose another Type or enter a Lag under Relationship Attributes.

From the keyboard, or with a click on each bar: click + Dependency, then the predecessor (Click the predecessor… (Cancel)), then the dependent task. This makes an FS dependency; change its Type in the inspector. With the keyboard, Tab to the chart after + Dependency, go to the predecessor's bar with ↑ / ↓ and press Enter, then the dependent task's bar and Enter. Each step is read out (Integrate Payload now depends on Detailed Design: finish to start.); Esc leaves dependency mode.

Holarch refuses a task that depends on itself (A task cannot depend on itself. Drop the end on another task.), a second dependency between the same tasks (That dependency already exists. Select its arrow to change its type.) and a loop (That dependency would make a loop. Remove one of the existing dependencies first.).

Update progress on a Gantt chart

  1. Drag a bar sideways to move its Start.

    It snaps to hours, or to days when zoomed out. From the keyboard, Tab to the chart: ← / → move the focused bar's Start a day (an hour for a task shorter than a day), ⇧← / Shift+← / ⇧→ / Shift+→ change its Duration by one unit, and the new dates are read out.

  2. Double-click a bar to enter its Percent Complete. (Or select the bar and click Set % Complete… in the inspector.)
  3. Use Columns ▾ to show Start, Due Date, Estimated Date of Completion and Percent Complete.
  4. Use the level selector to show sub-tasks.
  5. Look for red arrows. A red arrow means a task comes earlier than its predecessor and the lag allow. Move the task or change the dependency.

Keep the calendar and dates current

  1. On Project Management, click a calendar day.

    Its events appear under Events on ….

  2. Click All upcoming to return to Upcoming Events.
  3. To move a date, drag its event chip to another day.

    The time of day is kept.

  4. To add a dated entity, double-click the day (or select it and click + Event, or press N on it). Type the name, choose the class if it is not the one you used last, and press Enter.

    The entity gets that date (09:00) in its first date attribute. Fill in the rest in the inspector or on its page.

Set the countdown clock

  1. In Countdown Clock, click Set….
  2. Pick the entity, for example the launch milestone.
  3. Choose the Date attribute, a Title and a Text color.
  4. Click Save.

    The card takes your title and counts down to that date.

For a calendar with its own query and colours, create a Calendar chart: + New ▾ → Kanban Board… on Project Management, then choose Calendar as the Chart type, with a Time entity as the root.

Worked example: the CubeSat EO-1 demo

Create the demo project: Manage Projects → Project Files ▾ → New Demo Project. Then open Plan → Project Management.

You see Kanban Boards (1) and Gantt Charts (1) in the page header. The countdown card is titled Launch. It counts down to the Launch milestone on 20 October 2027.

Kanban. Click Kanban Boards (1) and open KB EO-1 Engineering Board. Its columns are the Task Status values:

ColumnCards
OpenKB.4 Analyze Detector Radiation Dose, KB.6 Fix Safe Mode Entry Timing, KB.9 Secure Backup Launch Slot, KB.11 Qualify Second Battery Cell Lot
In ProgressKB.1 Run Reaction Wheel Life Test, KB.5 Freeze Flight Software Interfaces, KB.10 Diagnose Wheel Friction
In ReviewKB.2 Characterize Battery Cell Fade, KB.8 Update Power Budget for CDR
ClosedKB.3 File S-band Frequency License, KB.7 Book Thermal Vacuum Chamber
  1. Drag KB.2 Characterize Battery Cell Fade to Closed.

    Its Status becomes Closed. Press ⌘Z / Ctrl+Z to put it back.

  2. Choose Board ▾ → Sort by due date.

    KB.2 (due 16 October 2026) and KB.10 Diagnose Wheel Friction (due 21 October) move to the top of their columns.

  3. Choose Board ▾ → Open as table.

    The Database lists all eleven tasks, with the query class:Task under:"…".

KB.2 mitigates risk RK-2. Its planned completion on 16 October 2026 is the first step down on RK-2's burn-down plan (see Risks, Issues & Decisions).

Gantt. Click Gantt Charts (1) and open SCH EO-1 Development Schedule. It shows nine phases:

  • They run from SCH.1 Mission Concept and Requirements (started 5 January 2026, 100%) to SCH.9 Launch and Early Operations (20 October 2027).
  • Eight depends on relationships link them.
  • SCH.4 Flight Software Development runs in parallel from 1 June 2026 and feeds SCH.6 Assembly, Integration and Test.
  1. Choose Columns ▾ and tick Due Date and Estimated Date of Completion.
  2. Double-click the SCH.3 Detailed Design bar and change Percent Complete from 15 to 25.
  3. Drag SCH.5 Flight Hardware Fabrication a week earlier, so it starts before Detailed Design finishes.

    The arrow from SCH.3 turns red.

  4. Press ⌘Z / Ctrl+Z to undo.

Calendar. The Project Management calendar shows the board due dates and the phase start dates. It also shows these milestones:

  • System Requirements Review (12 March 2026)
  • Preliminary Design Review (15 September 2026)
  • Critical Design Review (16 February 2027)
  • Pre-Ship Review (24 August 2027)
  • Launch (20 October 2027)

The demo also has a separate EO-1 Program Calendar chart.

Tips and good practice

  • Put every task under one board root and one schedule root. A Task can be on both: the board decomposes it for status, and the Gantt root decomposes it for dates.
  • Number tasks (KB.1, SCH.3). Numbers set the first order of cards and identify tasks in exports.
  • Drag dependencies from the bar end that matters: most links are finish to start (FS). Use Lag for a fixed wait, such as curing time, instead of a dummy task.
  • Set a Due Date on tasks with a commitment. The Gantt due marker turns red when the bar ends after it. Overdue cards show their due line in red.
  • Tie milestones to tasks with occurs. Reviews then appear on the calendar and in Upcoming Events.
  • Relate mitigation tasks to their risks with mitigated by. Their Start and Duration then drive the planned burn-down.

Common mistakes

  • A task is missing from the Gantt chart. One of these applies:
    • It lacks a Start or Duration. The note under the chart lists such tasks; click one to select it.
    • It is below the chosen number of levels.
    • It is not in the root's decomposition.
  • A task is missing from the board. It is not decomposed from the board within the chosen levels. Use Board ▾ → Add existing task….
  • A card shows in the last column (No Status, No Board Column). It has no value, or its value has no column on this board. Drag it to a column, or show its value with Board ▾ → Edit columns….
  • A new calendar event does not appear. You see Event created. It does not match the calendar query, so the calendar does not show it. Choose another query under Events from on the calendar's Root tab (or edit it with Edit Query in Database), or give the entity a matching class or label.
  • The countdown shows a + sign. The target date has passed, so the clock counts up from it.

How it connects

  • Risks, Issues & Decisions: risks are mitigated by tasks. Risk Burn-Down plans use each mitigation's Start + Duration. See Risks, Issues & Decisions.
  • Verification: test campaigns and fixes are tasks (for example KB.6 Fix Safe Mode Entry Timing, then rerun TC-09). Issues raised from failed tests can be related to them. See Verification.
  • Behavior: the Timeline diagram shows the same Start and Duration data for any Action. See Timeline Diagram.
  • Frameworks: DoDAF PV-2 and UAF Roadmap views open timelines and Gantt charts. See Frameworks.
  • Reviews: export charts to Word or images for a review package.

Project Management page

ControlAction
Kanban Boards (n)Opens the Charts page filtered to Kanban Boards.
Gantt Charts (n)Opens the Charts page filtered to Gantt Charts.
+ New ▾Kanban Board… or Gantt Chart…: opens New Chart for that type.

Calendar card

A month view of the project's dated Tasks, Kanban columns and milestones. Its query is class:Task OR label:"Kanban Column" OR label:Milestone. Events are coloured by the rules Board, Task and Time, then by class colour; U.S. holidays are shown.

  • ‹ / › change month; Today returns to the current month.
  • Each day shows up to three chips and +n more; the number in the corner counts its events.
  • Click a chip to open the entity.
  • Click a day to list its events in the Upcoming Events card.
  • Drag a chip to another day to move the date.
  • Click a legend entry to show or hide those events.
  • Double-click a day, press N on it, or click + Event, to add an event (see Add an event).

Upcoming Events card

Lists the next 50 future dates:

  • each Task's Due Date, with Completed: n%,
  • the Start of each Kanban column and milestone.

Each entry shows its date, and a task its percent complete. When a day is selected, the card shows Events on <date> and All upcoming. With nothing to show, it reads No dates ahead. Add a due date to a task.

Board Progress card

A bar chart of the number of tasks in each column of one board.

  • Choose the board in the selector.
  • Open opens the board.
  • Hierarchy opens the board's Hierarchy Diagram.

Empty states: Create a Kanban Board to see its progress. and This board has no columns. Choose Board ▾ → Edit columns… on the board.

Countdown Clock card

Counts the days to a date attribute of any entity, for example 360 days; on the last day it shows hours and minutes (5 h 07 min). It updates once a minute, and its tooltip shows the exact date and time. After the date has passed, the count is prefixed with +.

Set… first asks for the entity (Count Down to an Item). Then Countdown Clock asks for the Title, Date attribute and Text color; click Save. The card shows your title.

Empty: Choose an entity and a date attribute to count down to.

Creating a chart

New Chart creates a chart. + New ▾ on Project Management opens it for a Kanban board or Gantt chart, and its Chart type list also offers Calendar and the other types; + New Chart on the Charts page creates an XY plot, risk burn-down or matrix.

  1. Chart type: XY Plot, Risk Burn-Down or Matrix on the Charts page; every type, including Calendar, Gantt Chart and Kanban Board, from Project Management. A description of the type is shown. A Kanban Board also asks for its Columns: Task Status (the default), a class workflow from Schema → Workflow that watches another attribute, or Own columns (the Board Column attribute, with the values you type). An XY Plot asks where its Data is: Stored in the chart (the default) or Linked to model entities.
  2. Root Task (Root Time for a calendar, Root Asset for an XY plot, Root Risk for a risk burn-down): type to find an existing item and pick it, or type a name for a new one.
  3. Click Create. The chart opens.

Choosing an existing item adds the chart label to it.

Charts page

The Charts page lists the XY plots, risk burn-downs and matrices as cards (Kanban boards, Gantt charts and calendars are listed from Project Management) in the same gallery as the Diagrams page: search, sort (Recently edited, Number (outline order), Name, Class), a pill per chart type with its count, and Show more. ⋯ on a card: Open, Open in ▸ Item View, Stop Listing as a Chart (keeps the item, removes its chart label) and Delete…. The Dashboard Charts tab holds the live charts of the project dashboard. The Trends tab shows requirements volatility, verification burn-up and action closure over time; see Trends.

Dashboard chart types

+ New Chart on the Dashboard Charts tab asks for a Title and a Chart Type:

  • Bar, Pie or Doughnut, Polar Area, Radar, Tree Map, Line: the items of a class (Items) counted by Group By (class, label, an enumeration such as Status, ranges of a number, or creation date).
  • Pareto: the same groups, largest first, with a line for their cumulative share of the total and a dashed line at 80%. Bars up to the 80% mark are blue; the rest are grey. Past twelve groups, the rest are summed into Other. The table view adds Cumulative %.
  • Trend: a Metric (Requirements Volatility, Verification Burn-Up or Action Closure) per Interval; for Action Closure also the Records (Actions, Issues, Nonconformances, or Issues and actions). Items and Group By do not apply.

A single Undo takes back each addition, edit or deletion of a dashboard chart.

Plan → Charts → Trends shows three charts for one Interval (Week, Month or Baseline). Each value is measured at the end of its period.

ChartShows
Requirements VolatilityRequirements Added, Changed and Deleted per period (stacked bars), and Volatility %: those changes as a share of all requirements at the end of the period (line, right axis). A change is an edit of the name, number, text, labels or an attribute; Status and the quality scores do not count. A requirement added in a period is not counted as changed in it too.
Verification Burn-UpRequirements, requirements with Verification planned (a Verification Method or a verifying test case) and Verified requirements (rolled-up status Passed, as in the RVTM).
Action ClosureOpened to date and Closed to date (lines) and Open at the end of each period (bars). Action Closure above the charts picks Actions, Issues, Nonconformances, or Issues and actions.

Where the numbers come from:

  • Recorded changes. The project keeps its most recent 3,000 to 4,000 recorded changes; volatility per week or month and the status history of test cases come from them. Earlier changes are kept in the edit archive and are not read here.
  • Dates. When a requirement, test case or action was created; a test case's Test Date (a Passed or Failed result dated later than a moment counts as Not Run then, when no recorded status change says otherwise); an action's Closed Date.
  • Baselines. With the Baseline interval there is one point per project baseline and one for Now. Volatility compares each baseline with the one before it, and Now with the last baseline; the burn-up reads the results saved in each baseline.

Each card has ▤ (show as table) and ⋯: Add to Dashboard Charts (a single Undo takes it all back) and Export… (Chart (PNG), Chart (SVG), Data (CSV)). The interval and record kind are kept in this browser. On very large projects the charts are computed behind the progress card.

Chart editor

Kanban boards, Gantt charts and calendars open in the chart editor (charts/<type>/<id>). Common controls:

ControlAction
‹ All ChartsBack to the Charts page, filtered to this type.
▲ ParentOpens the same chart type on the root's parent.
Open ▾For the root (or the selected item): Item View, Hierarchy Diagram, Spider Diagram, Action Diagram and Timeline Diagram (for Actions), and other charts on the same entity.
Export…Chart (PNG) (with Transparent background), Chart (SVG), Chart (Word), Chart (HTML), Data (CSV).

The inspector shows the chart's tabs: Root (the root entity's attributes), Comments, Selected (when an item is selected) and, on a calendar, Day.

On an XY Plot and a Risk Burn-Down, the Root tab ends with a Chart section. Its fields apply at once, and a single Undo takes back each change:

GroupFields
TitleShow title, Position (Top, Bottom).
X axisShow label, Label, Scale (Linear, Logarithmic; XY Plot).
Y axisShow label, Label, Scale and Maximum (XY Plot; empty is automatic).
LegendShow legend, Position (Top, Bottom, Left, Right).
GridShow gridlines.
Points (XY Plot)Radius (1–12), Connect points with lines.
Actual line (Risk Burn-Down)Line colour, Point colour, Point style, Point radius (0–12).
Selected pointHighlight colour.

Restore Defaults returns every chart setting to its default.

XY Plot

An XY Plot (root Asset) draws one or more data sets of X/Y points. Its data is either:

  • Stored in the chart: the points are saved with the chart.
  • Linked to model entities: each data set is a child Asset of the root, and each point is a Characteristic (Y) that specifies the Asset and is related to a second Characteristic (X); their Value attributes are the coordinates.
ControlAction
Data…Edit the data sets: + New Set, Add Existing Asset… (linked data), name and colour, + Point, × to remove a point, Remove Set. Apply saves it, and a single Undo takes it all back.
Import CSV…Pick a CSV file. Choose where the Data goes (Stored in the chart or Linked to model entities). One row per column shows its title, Maps To (X, Y (data set) or Ignore) and sample values; the first column starts as X and the numeric columns as Y. A preview shows the result. Import adds one data set per Y column, and a single Undo takes it all back.
Show X / Show YLinked data: which Characteristic a click on a point selects.

Click a point stored in the chart to edit its X and Y on the Point tab, or remove it. Click a legend entry to hide or show its data set.

Kanban Board

Toolbar

ControlAction
+ TaskNew Task in the column you pick (the first column by default).
Board ▾Edit columns… (the attribute, the values shown and their order, WIP limits, new values). Cards: Full (default) or Compact. Order in a column: Manual (drag cards) (default) or Sort by due date. Swimlanes ▸ None, Assignee, Parent task or Milestone. Add existing task…, Open as table.
Level selector1 level to 5 levels, or All levels (default): how deep in the board's decomposition cards are collected.
Filter cardsHides the cards whose name, number, description or assignee does not contain the text. The column count shows shown/total.

Columns

Each column header shows its value and card count (n of limit with a WIP limit); + Task at its foot adds a task with that value. ⋯ opens New task in this column, Move left, Move right, Colour… (the value's colour in the attribute, used on every board), Hide column (its cards move to the last column; the value stays in the attribute) and Edit columns…. The last column, such as No Status, holds the cards without a column.

Cards

A card shows the task name and, below it:

  • the number (Full only),
  • a due chip, Due <date>, or Overdue · <date> in red when the date has passed and the task is below 100%,
  • the number of comments,
  • the assignee's initials (the full name on hover),
  • the number of sub-tasks (Full only).

Hover over a card to read its description. Click a card to select it; click it again to deselect. Drag it onto a column to move it; with manual order, where you drop it is its place in the column. Sort by due date puts the earliest due date first and undated cards last.

Right-click a card (or press Shift+F10 or the Menu key on it) for Move to ▸ (a column, or the last column to clear the value), Remove from board (the task stays in the project; the message has Undo and Delete item…) and Delete item… (asks first).

From the keyboard:

  • Tab to the board. The arrow keys move between cards (↑ ↓ in a column, ← → across columns).
  • Enter or Space selects the card.
  • ⌥← / Alt+← / ⌥→ / Alt+→ move the card to the previous or next column; ⌥↑ / Alt+↑ / ⌥↓ / Alt+↓ move it up or down in its column (manual order). Focus stays on the card.
  • Delete removes the card from the board.

Data export

Export… → Data (CSV) writes Column, Number, Name, Due Date and Percent Complete for every card, including those without a column.

Gantt Chart

Toolbar

The toolbar has the diagram toolbar's groups. Export… in the chart header is the output.

GroupControlAction
Mode+ DependencyClick the predecessor, then the dependent task: an FS dependency. Click the button again to cancel. Dragging from a bar end does the same with any Type.
Insert+ TaskNew Task (Start required).
InsertAdd existing task…Pick an Action; Holarch asks for a Start and Duration when it has none.
EditRemoveShown when something is selected. A task leaves the chart at once (it is removed from the root's decomposition; the entity stays) and Removed from chart. offers Undo and Delete Item…; ⇧ / Shift-click deletes the task after a confirmation. A Dependency entity is deleted after a confirmation.
ViewLevel selector1 level (default) to 5 levels, or 10 levels.
ViewColumns ▾Number, Name and every Task attribute, in the order of the inspector. Number, Name and Duration are shown on a new chart. Each column is as wide as its header and longest value; longer names end in ….
View− / +Zoom out / in (eight steps, from hours to months).
ViewReset viewReset zoom and scroll.
ViewGo to selectedScrolls the selected row into view.
ViewCritical PathMarks the tasks that decide the finish date and shows each task's total float. See Critical path. The choice is kept in this browser.
ViewTable ViewShows the tasks above the chart as a table: Number, Name, Start, Duration, % Complete, Finish, Due Date and Depends on (and Total Float with Critical Path on). Start, Duration and % Complete are fields you can edit from the keyboard (Enter or leaving the field saves). With + Dependency on, press the task names in order. The choice is kept in this browser.
ViewFind a taskHighlights matching rows; Enter / Shift+Enter move between matches.

When the window is narrow, controls that do not fit move into ⋯ at the end of the row.

Chart

  • The left part is a table of the chosen columns; the right part is a time axis whose ticks adapt to the zoom (hours, days, weeks, months, quarters, years).
  • Each bar shows the full duration in a light shade and Percent Complete in a solid fill. Point at a bar for its start, duration and percent.
  • A diamond marks the Due Date; it is red when the bar ends after it.
  • A dashed red line marks today.
  • Click a row to select the task; click it again to deselect.
  • Double-click a bar for Completion Percentage.
  • Drag a bar to move its Start.
  • With the keyboard: press Tab to reach the bars (one stop for the chart), then ↑ / ↓ to go to another task (Home / End: the first or last). ← / → move the task one day earlier or later (one hour for a task shorter than a day); Shift+← / Shift+→ make its Duration one unit shorter or longer. Each key press is one step for ⌘Z / Ctrl+Z, and screen readers announce the new start and finish. Enter or Space selects the task.
  • Each bar has a circle at its start and its finish (shown on hover and on the selected row). Drag from one to another bar to add a dependency.
  • Click an arrow to select its dependency. The Dependency tab of the inspector shows the two tasks, Type and Lag, and Remove Relationship. Remove in the toolbar also removes it; ⌘Z / Ctrl+Z restores it.
  • Point at an arrow for <dependent> depends on <predecessor>: <Type>, with the lag when there is one.

Critical path

With Critical Path on, Holarch works backwards from the last finish on the chart through the dependencies (their Type and Lag) and computes each task's total float: how long it can slip without moving that finish. Tasks keep their own Start and Duration; nothing is rescheduled.

  • Critical tasks have no float. Their bars are red and labelled Critical. Other bars show their float, for example 2 d float.
  • Driving dependencies, where the successor starts exactly when its predecessor allows, are drawn red and thicker.
  • A task with negative float is late against a successor: one of its dependencies is violated. It counts as critical.
  • A sub-task shown under its parent (more than one level) can float only until its parent must finish.
  • The note above the chart reads Critical path: 3 of 9 tasks, finish Nov 19, 2027., and says how many tasks are late.

Gaps between tasks count as float. A schedule whose tasks start well after their predecessors finish has few critical tasks; close the gaps, or add the missing dependencies, to see the chain that drives the finish.

Data export

Export… → Data (CSV) writes Number, Name, Start, Duration, Finish, Percent Complete, Total Float (days) and Critical (Yes or No) for each row.

Calendar chart

A Calendar chart (root: a Time entity) is a month calendar with its own query, date attributes and colours.

ControlAction
+ EventAdds an event on the selected day, or today (see Add an event).
Find EventsSearch by number or name; click a result to jump to its date. Clear Search and Close.
U.S. holidaysShows or hides the holidays layer.

The calendar shows the visible month and loads one month before and after it, so a calendar of any size stays quick.

Calendar settings

The inspector's Root tab ends with the Calendar section. Each change applies at once and can be undone with a single Undo.

  • Events from: Tasks, milestones and board columns (the default query), or a project query saved in the Database. The query text shows below.
  • Edit Query in Database: opens the Database with the query. Change it there and click Update "<name>" to save it; the calendar follows. A calendar on the default query first gets its own project query, named after the calendar.
  • Date attributes: the date attributes that become events, such as Start, Due Date, Finish or Estimated Date of Completion. A new calendar shows Start and Due Date.
  • Colour by: Class (the class colours of the schema), Label (the first label of each entity) or Status (the workflow's status attribute, with its value colours from the Schema Editor).
  • Rules: rows of Class, Label and colour. An event takes the colour of the first rule it matches; + Rule adds one and × removes it.

Click a legend entry above the grid to hide or show those events.

Calendars made in earlier versions keep showing what they showed: their own query, every date attribute, and their filter groups as rules. Their first change turns the query into a project query named after the calendar.

Add an event

  1. Double-click a day, or select it and click + Event, or press N on it.

    A name field opens in the day, with the class you used last (Task at first).

  2. Type the name and press Enter. Esc cancels.

    The entity is created with that date at 09:00 in the first of the calendar's date attributes that its class has, and the inspector shows it for the other fields.

Day tab

Click a day to open it. It lists Events on <day> and has + Event on This Day. Each event's ⋯ offers:

  • Change Date…: a date and time field for that attribute (the keyboard alternative to dragging the chip),
  • Remove from Calendar: clears that date on the entity at once; the message offers Undo and Delete Item…,
  • Delete Item…: deletes the entity after a confirmation.

Export… → Data (CSV) writes Number, Name, Class, Attribute, Date and Colour (the legend entry) for every event, in every month.

From the keyboard: Tab to the calendar. The arrow keys move a day or a week, Home / End go to the start or end of the week, Page Up / Page Down change the month, Enter opens the day and N adds an event on it. Each day is read with its date and events.

Keyboard shortcuts and gestures

Keys or gestureWhereAction
Drag a cardKanbanMove it to another column.
ArrowsKanbanMove between cards.
Enter / SpaceKanban cardSelect or deselect it.
⌥← / Alt+← / ⌥→ / Alt+→Kanban cardMove it to the previous / next column.
Arrows, Page Up / Page Down, EnterCalendarMove between days, change the month, open the day.
N or double-click a dayCalendarAdd an event on that day; Enter creates it, Esc cancels.
Enter / Shift+EnterKanban or Gantt search boxNext / previous match.
Drag a barGanttMove the task's Start.
Double-click a barGanttSet Percent Complete.
Drag an event chipCalendarMove the date to another day (or ⋯ → Change Date… in the Day tab).
⌘Z / Ctrl+Z / ⇧⌘Z / Ctrl+Shift+ZAnywhereUndo / redo. Each move, drag or dialog is one step.

Messages

MessageMeaning and fix
The task has no name. Enter a name or a number.New Task needs a name or number.
The task has no start. Enter a start date; a Gantt bar needs one.New Task on a Gantt chart needs a Start.
Enter a Start.Add existing task needs a Start.
<class> has no date attribute. Choose another class.The class chosen when adding an event has no date attribute.
Event created. It does not match the calendar query, so the calendar does not show it.The entity exists but the calendar's query excludes it.
Enter a name for the root task, or pick an existing item.New Chart without a root.
A <chart type> needs a <class> as its root. Pick another item or type a new name.New Chart with an existing item of the wrong class.
The card did not move. The board was redrawn; try again.A drag failed; try again.
This board has no columns. — Add values to <attribute> with Board ▾ → Edit columns…, or in the Schema Editor.The board's attribute has no values to show. Add values, or pick another attribute in Edit columns….
This board has no tasks. Add one with + Task.Board with columns but no cards.
No tasks on this chart — Add a task with a Start and a Duration: + Task.Empty Gantt chart.
n tasks are not shown because they have no Start or Duration: …Give those tasks a Start and Duration.
The calendar query has a syntax error. Correct the query.Fix the project query with Edit Query in Database.
The project query of this calendar was deleted. Choose another one under Events from.Pick a query on the Root tab.
A Gantt chart needs a Task root; … is a … / The Gantt chart root no longer exists.A link (for example from a UAF view) pointed at a root that is not a Task.
This tool needs a Task (or subclass) as its root. / The root entity of this chart was deleted.The chart's root has the wrong class or was deleted.

Limits

  • Kanban levels: 1–5 or all; Gantt levels: 1–5 or 10.
  • Gantt zoom: eight steps; bar drags snap to one hour, or one day when zoomed out.
  • Calendar: three chips per day in the month grid (+n more for the rest); events load for the visible month and one month on each side.
  • Upcoming Events: the next 50 dates.
  • Percent Complete: 0–100.