Verification
Plan tests and see what is verified.
Know at any moment which requirements are verified, which failed and which nobody has tested yet. Plans, test runs and evidence live in the same model as the requirements, so the coverage report is always current.
What you can do
Plan verification as you write requirements
Give each requirement its method, level and success criteria while you write it, and spot one that cannot be verified as written.
Organize your test campaign
Group test cases into suites, each one linked to the requirements it verifies, with step-by-step procedures and expected results.
Run tests and keep the evidence
Record each result step by step with the build, the unit under test and an attached log, data file or photo.
Track every failure to closure
Turn a failed test into an issue that is already linked to the test and the requirements it affects.
See coverage at a glance
The RVTM counts verified, failed, not run and unverified requirements, and a failure in a child requirement shows on its parent.
Fill the gaps in your traceability
Lay out any two sets of model items as a matrix, show only the gaps and add the missing links in place.
Let Holarch find what you missed
Model checks review the whole model for problems such as requirements with no test or failed tests with no issue, and offer a fix.
Compare test campaigns
Save the results of each campaign as a test cycle, compare one cycle with another and produce a test report.
Keep every run and its evidence
Attach several evidence files to a test case, give it a verification stage and event, and click ↻ Re-run to record a new result without losing the run history.
Plan with the VCRM
Switch the RVTM to the verification cross-reference matrix: inspection, analysis, demonstration and test columns with level, stage and event for each requirement.
Close verification formally
With the Formal program switch, disposition failed tests, approve deviations and waivers, and sign off each requirement on the RVTM, which counts the waived and closed ones. See Formal Program.
See coverage across projects (Team)
Program Coverage shows which items of a program project are traced from subsystem or contractor projects, and which links no longer resolve. See Program Coverage.
For the test engineer
- Run tests one after another with the procedure in front of you.
- Draft a test case from a requirement with AI and review it before it is created.
- Every run is logged with who tested what, and when.
For the review board
- One RVTM shows what is verified, failed and still open.
- Export it as Excel, CSV or Word for the review.
- Coverage is current because it comes straight from the model.
See it in Holarch
Short clips on the CubeSat EO-1 demo. More on the Videos page.