Holarch

Plan

Charts

Saved charts (XY plots, risk burn-downs and saved matrices: items with history, usable in documents) and quick summary charts. Kanban boards, Gantt charts and calendars are on Project Management.

Where to find it

  • In the navigation rail: Plan → Charts.
  • Address options: charts?type=<slug>, ?tab=widgets and ?tab=trends; an editor opens at charts/<slug>/<id>.

Main actions

  • All Charts: the gallery (search, sort, a pill per chart type, Show more) and + New Chart: the chart type with its options and one Root field (an existing item or a new name). Card ⋯: Open, Open in ▸ Item View, Stop Listing as a Chart, Delete….
  • XY Plot (root Asset): data sets of X/Y points, Stored in the chart or Linked to model items (each set a child Asset, each point a pair of Characteristics). Data… edits the sets and points; Import CSV… maps each column to X, Y (a data set) or Ignore, with a preview. Click a point to edit it on the Point tab.
  • Risk Burn-Down (root Risk): the risk's level over time. Record Snapshot adds today's probability and consequence, Snapshots… edits them, and Mitigation Plan… draws the planned step-down at each mitigation's completion date (Start + Duration). The actual line's colours, point style and radius are in the Chart section.
  • Calendar, Gantt Chart, Kanban Board: listed and created on Project Management (their lists open here with ?type=). Matrix: a saved Traceability Matrix.
  • Chart editor: ‹ All Charts, ▲ Parent, Open ▾, the type's tools and Export… (Chart (PNG) with Transparent background, Chart (SVG), Chart (Word), Chart (HTML) and, where the chart has data, Data (CSV)). The inspector shows the root, comments and the selection. On an XY Plot and a Risk Burn-Down the Root tab ends with a Chart section (Title, X axis, Y axis, Legend, Grid, Points or Actual line, Selected point): changes apply at once, and a single Undo takes back each one; Restore Defaults resets them.
  • Dashboard Charts tab: bar, pie, polar area, radar, tree map, line, Pareto and risk-matrix charts grouped by class, label, an enumeration, numeric ranges, created date or probability × consequence, and Trend charts. + New Chart, Restore Defaults; each chart's ⋯ has Edit…, Duplicate, Export… (Chart (PNG), Chart (SVG), Data (CSV)) and Delete. Each change can be undone with a single Undo. Pareto: groups largest first, a cumulative % line and a dashed 80% line; past twelve groups the rest is Other.
  • Trends tab: Requirements Volatility (added, changed and deleted requirements per period and their share of all requirements; Status and quality scores do not count), Verification Burn-Up (requirements, verification planned, verified as in the RVTM) and Action Closure (opened and closed to date, open; Actions, Issues, Nonconformances, or both). Interval: Week, Month or Baseline (one point per baseline and Now; volatility compares consecutive baselines). Built from the project's recorded changes (the most recent 3,000 to 4,000), created dates, Test Date and Closed Date, and baselines. Each card: ▤ table, ⋯ Add to Dashboard Charts and Export….

Tips

  • The risk-matrix chart uses the project risk scale, so its colors match the Risk Diagram.
  • Chart images and exports use light-theme colors.

Related

Project Management · Run a Risk Register with the MIL-STD-882E Scale · Home