Holarch

Risks, issues and decisions

Rate risks and record decisions in the model.

Know your biggest risks, who owns them and how far they will fall as mitigations finish. When a choice comes up, compare the options openly and keep the decision and its reasons next to the design.

What you can do

Rate every risk on one scale

Use the default 5 × 5 matrix, MIL-STD-882E or your own definitions, and every register, matrix and chart in the project uses the same levels.

Keep one risk register

Every risk with its owner, handling, rating and mitigations in one table, ready to filter by level and export for the review.

See which requirements a risk puts in danger

Each risk lists the requirements at stake, worked out from what the risk is attached to in the model.

Show the risk coming down

Plan how each mitigation lowers the rating, record the actual rating at each review, and show both on a burn-down chart.

Compare options fairly

Score alternatives against weighted criteria, using values already in the model where they exist.

Know if the winner holds up

See how far each weight can move before a different option wins, and cross-check the result on a Pugh matrix.

Record the decision and why

Save the choice with its rationale, date and decider, and share the trade study as a Word summary or Excel workbook.

Track issues and actions to closure

Issues & Actions keeps problems, action items with assignees and due dates, and nonconformances from failed tests in one register. Record opportunities next to the threats in the Risk Register. Issues & Actions.

Log hazards and their controls

With the Safety & Reliability switch, the Hazard Log rates each hazard on the MIL-STD-882E matrix before and after its controls, counts verified controls, and asks for a new acceptance when a control changes. Safety & Reliability.

Analyse failure modes with an FMECA

The FMECA worksheet records each failure mode of an asset or function with its effects, RPN and criticality, and links a mode to the hazard or risk it leads to.

For the risk owner

  • See your risks and the mitigations that will retire them.
  • Draft candidate risks for a subsystem with AI and keep the ones that fit.
  • Mitigations are tasks you can schedule alongside the rest of the work.

For the program manager

  • The highest risks are counted on the project home page.
  • Burn-downs show whether risk is falling on plan.
  • Every decision says what was chosen, by whom and why.

See it in Holarch

Short clips on the CubeSat EO-1 demo. More on the Videos page.

Trade Studies with SensitivityA decision you can defend: weights, scores and sensitivity
Risk Register, Risk Matrix and Burn-DownEvery risk rated, owned and burned down
Decisions with Their RationaleWhy the spacecraft uses S-band, on record

Keep risks and decisions next to the design.