Project Management
Boards, schedules and dates: Kanban boards, Gantt charts, a calendar, upcoming dates, board progress and a countdown.
Where to find it
- In the navigation rail: Plan → Project Management.
- Deep links:
kanban,ganttandcalendaropen the board, chart or calendar directly; add?id=<id>(orkanban/<id>) for a specific one.
Main actions
- Page header: Kanban Boards (n), Gantt Charts (n) and + New ▾ (Kanban Board…, Gantt Chart…).
- Cards: Calendar (+ Event, or double-click a day: type a name, pick the class and press Enter; drag an event to another day), Upcoming Events (click a day for its events), Board Progress (board selector, Open, Hierarchy) and Countdown Clock (Set…; days to the date, hours and minutes on the last day).
- Calendar chart: + Event, Find Events and the U.S. holidays layer. The Root tab's Calendar section sets Events from (the default tasks, milestones and board columns, or a project query; Edit Query in Database opens it there, and Update saves it), the Date attributes shown (Start and Due Date for a new calendar), Colour by Class, Label or Status, and colour Rules by class and label. Click a legend entry to hide its events. Each change can be undone with a single Undo.
- Kanban board: the columns are the values of an attribute of the cards (Task Status by default, a workflow's attribute, or Board Column for a board's own columns); moving a card sets the value, and a workflow that watches the attribute decides which moves are allowed. + Task, Board ▾ (Edit columns… for the attribute, the values shown, their order, WIP limits and new values; Full or Compact cards; Manual order or Sort by due date; Swimlanes ▸ by Assignee, Parent task or Milestone; Add existing task…; Open as table), Levels and Filter cards. Column colours are the values' colours in the Schema Editor (or ⋯ → Colour… on a column). Cards show the name, a due chip (red when overdue), the comment count and the assignee's initials; hover for the description. Right-click a card for Move to ▸, Remove from board and Delete item…. Boards made with column items convert when the project opens (a single Undo takes it all back; the old items stay).
- Gantt chart: toolbar groups as on diagrams: Mode (+ Dependency: click the first task, then the second; from the keyboard, Enter on each bar), Insert (+ Task, Add existing task…), Edit (Remove), View (Levels, Columns ▾ with Number, Name and every Task attribute in inspector order, zoom, Reset view, Go to selected, Critical Path, Table View, Find a task); Set % Complete…. Critical Path marks the tasks with no total float (red bars, Critical) and the driving dependencies, shows each other task's float, and notes the finish date; a negative float means a violated dependency. Tasks keep their dates: nothing is rescheduled. Table View adds Total Float; Data (CSV) has Total Float (days) and Critical. A dependency is a depends on relationship with Type (FS, SS, FF, SF) and Lag: drag from a bar end to the start or finish of another bar (the pair of ends gives the Type), then change Type or Lag on the inspector's Dependency tab. Dependency items from older projects convert when the project opens.
Tips
- Boards and Gantt charts are chart items, also listed under Charts; the Timeline diagram shows the same Start and Duration data.
- LML 2.0 task attributes: a Task's Planned Start shows as a dashed tick on its Gantt row, so a late or early Start stands out; Priority (Low, Medium, High) shows as a chip on its Kanban card, and a task without a value shows its High, Medium or Low label instead.
- Keyboard: on a board the arrows move between cards, Enter selects one, ⌥← / Alt+← / ⌥→ / Alt+→ move it to the previous or next column, ⌥↑ / Alt+↑ / ⌥↓ / Alt+↓ reorder it in its column, and ⇧F10 / Shift+F10 opens its menu (Move to ▸, Remove from board, Delete item…). On a calendar the arrows move between days, Page Up / Page Down change the month, Enter opens the day and N adds an event on it; each event's ⋯ in the Day tab has Change Date…. On a Gantt chart, Tab reaches the bars and ↑ / ↓ go between them; ← / → move a task a day (an hour for a task shorter than a day), ⇧← / Shift+← / ⇧→ / Shift+→ shorten or lengthen it by one unit of its Duration, a single Undo takes back each key press, and the new dates are announced. Table View lists the tasks with editable Start, Duration and % Complete.