Needs & Requirements · How-to
Write and Trace Requirements
Write requirements in a document, check their quality, get them approved and keep them under control.
- Open Needs & Requirements → Documents and click + New Document. Choose a type, name and number, then a template (Blank, built-in, project or organization) and Finish.
- Type each requirement in the quick entry bar under the document and press Enter. Choose Under … in the section list to add it inside a section. With an item selected, ⌘↵ / Ctrl↵ adds a sibling and ⌥⌘↵ / Ctrl+Alt↵ a child.
- Select a requirement. The inspector on the right shows its attributes: set Priority, Criticality, Verification Method and Level, Owner and Source. Status, Verification Method and Quality Score are the default document columns; add others with View ▾ → Columns ▸.
- Mark open values: set TBD/TBR to TBD or TBR with a TBD Owner and Due Date, or write TBD in the text. They appear on Needs & Requirements → TBD/TBR.
- For a fixed sentence shape, click EARS ▾ beside the requirement's Description: it shows the statement's EARS pattern (Ubiquitous, Event-driven When, State-driven While, Unwanted behavior If … then, Optional feature Where, Complex) or what to fix, and inserts a template to fill in (a single Undo takes it all back). Model Checks rule Requirement.11 checks every statement once you switch it on in Settings.
- Check the wording: Check ▾ → Check Quality. Fix requirements that score low, or select one and use ✦ AI ▾ → Add Measurable Criteria… or Split Compound Requirement…. See Run a Check Quality.
- Trace each requirement: in the inspector's Trace section, add satisfied by (a function or asset) and verified by (a test case). The dot next to each requirement turns green when it has both. For many at once use the Traceability Matrix.
- Send them for review: set Status to In Review. Reviewers open Needs & Requirements → Approvals and use Approve or Reject… in the Item View. Editing an approved requirement's text moves it back to In Review.
- When a requirement changes, its links to the items downstream need review. Check them on Needs & Requirements → Links to Review and mark them reviewed.
- Freeze the document: Version ▾ → Save Baseline… in the title block, with a name and the approvers. Compare versions later with Version ▾ → Compare Versions….