Verification
RVTM
The Requirements Verification Traceability Matrix: every requirement with its verification method and level, the test cases that verify it, its own result and the result rolled up from its children.
Where to find it
- In the navigation rail: Verification → RVTM.
- Address options:
rvtm?status=<status>and?q=<text>.
Main actions
- Page header: Export ▾ (Excel, CSV, Word) and Test Center.
- Cards: Verified (Passed) with a progress bar, then Failed, Not Run, Planned-only and Unverified; click one to show only those requirements, and the chip Status: … × to show all.
- The number and requirement columns stay in view while a wide table scrolls sideways. Where a status chip is shortened to fit, point at it for the full text.
- Requirements in a document labeled Customer Specification are not in the RVTM rows or totals; the Compliance Matrix assesses them.
- Filter by number or name. Click a row (or press Enter) to see the requirement in the inspector; Esc deselects.
- ⚠ after a requirement: one of its links needs review, because the requirement changed or the item upstream of it changed. Its tooltip names the changed items; click it to review the links (Diff, Mark Reviewed…, Open Links to Review). A ⚠ after a test case in Verified by marks that verification link, with the changed fields and date in its tooltip. See Links to Review.
- Stage and Evidence: the verification stages of the verifying test cases (Development, Qualification, Acceptance, Integration, Operational), and the number of evidence files. Click the number to attach reports that verify the requirement directly, such as an analysis report.
- RVTM | VCRM: the VCRM view is the planning view, with one column per method (I, A, D, T), level, stage and event. Exports include stage and event.
- With the Formal program on (Project Preferences → Program features): a Waived card (requirements not verified but covered by an approved, unexpired deviation or waiver; click to filter), a Closed (signed off) card and two columns. Deviation/Waiver lists the deviations and waivers against the requirement; a failed result without a disposition shows Disposition…. Closure shows Sign Off… once the requirement Passed or an approved, unexpired deviation or waiver covers it; sign-off records your name, the date and notes (a single Undo takes it all back), and Reopen clears it. A closed requirement whose result later changes shows Closed, now …; one whose text changes after sign-off shows Closed, requirement changed until its links to test cases are reviewed. See Deviations & Waivers.
Tips
- A requirement is verified when a verifying test case Passed, or when all its child requirements are verified; a failure below makes the parent Failed.
- LML 2.0 Verification Requirements: a Verification Requirement that verifies a requirement brings the test cases it is traced to into Verified by, and its Verification Method and Acceptance Criteria when the requirement has none of its own. Test cases that verify the requirement directly count as before.
- An approved waiver lets a requirement close, but it does not count as verified: it is counted as Waived and keeps its own status (for example Failed).
- In a configuration view the RVTM lists that configuration's requirements and results; in All configurations a Configuration column group shows one status per configuration. Effectivity Column adds each requirement's effectivity (Product Line).
Related
Set Up Verification, Run Suite and Produce the RVTM · Test Center
Full documentation: Verification › RVTM · Requirements and Verification in SysML v2 Projects › RVTM · Product Lines and Configurations › RVTM