Course chapters
Training · Track 14. Spreadsheets · Chapter 14.1 of 5
14.1 Sheets, Data and Formulas 4:16
Create a spreadsheet, name and color its sheets, enter data, and write formulas with the formula bar, the Name Box and autocomplete.
Shows Holarch 2.35.
What you’ll learn
- Create a spreadsheet in a project and find the toolbar, Name Box, formula bar and sheet tabs
- Rename, color and add sheets
- Enter values and write formulas in the formula bar
- Select ranges with the Name Box and copy a formula with Fill Down
- Finish function names with autocomplete and refer to another sheet
Start the mass budget of the CubeSat EO-1 demo project in a new spreadsheet: rename a sheet by double-clicking its tab and give it a color, add a second sheet, type headers and values into cells, write a formula in the formula bar, select a range in the Name Box and fill the formula down, let formula autocomplete finish SUM, and reference a cell on another sheet.
Project files
- Finished project (.holarch.json; Manage Projects → Project Files ▾ → Import Project (.json)…)
The video plays from holarch.app; see the Privacy Policy.
Practice
Do this yourself in Holarch, on CubeSat EO-1.
- Open Project Files → New Demo Project and choose the CubeSat. Open Plan → Spreadsheets, click New Spreadsheet and name it
EO-1 Mass Budget. - Double-click the Sheet1 tab, type
Budgetand press Enter. Right-click the tab and choose a color. - Click + beside the tabs, name the new sheet
Assumptions, typeMass allocation (kg)in A1 and12in B1. - On Budget, type the headings
No.,Subsystem,Mass,Contingency,With contingencyin A2:E2 and six subsystems with their masses and contingencies in rows 3 to 8. - In E3, type
=C3*(1+D3)in the formula bar. TypeE3:E8in the Name Box, press Enter, and choose Fill → Fill Down. - In E9, type
=SU, pick SUM from the list and finishE3:E8). In E10 type=Assumptions!B1, and in E11=(E10-E9)/E10.
You're done when E9 shows the total with contingency, E10 shows 12 from the Assumptions sheet and E11 shows the margin.
Check yourself
- Where do you see the formula of a cell that shows a result?
- How do you copy the formula in E3 to E4:E8 with its references adjusted?
- How does a formula read a cell on another sheet?
Show the answers
Where do you see the formula of a cell that shows a result?
In the formula bar, above the grid, when the cell is selected.
How do you copy the formula in E3 to E4:E8 with its references adjusted?
Select E3:E8 (for example by typing it in the Name Box) and choose Fill → Fill Down.
How does a formula read a cell on another sheet?
With the sheet name, an exclamation mark and the cell, such as =Assumptions!B1.
Read more
Transcript
Show the transcript (narration and what is on screen)
Introduction
Welcome to the spreadsheet track. A Holarch spreadsheet is an Excel-style workbook inside a project, calculated in Excel's formula language, right next to the model. Across five chapters you build one workbook: the mass budget of the CubeSat EO-1.
In this chapter you create the workbook, set up its sheets, enter the budget and write its first formulas.
A new spreadsheet
We work in the CubeSat EO-1 demo project. To make your own copy, open Project Files, then New Demo Project, and choose the CubeSat. Its model already holds the mass of every component.
On screen: The CubeSat EO-1 demo project: Home.
Open Plan, then Spreadsheets, and click New Spreadsheet. Name it EO-1 Mass Budget.
On screen: Plan → Spreadsheets → + New Spreadsheet → EO-1 Mass Budget.
The editor opens. The toolbar is at the top. Below it are the Name Box, which shows the active cell, and the formula bar, which shows what the cell holds. The sheet tabs are at the bottom.
On screen: The editor: toolbar, Name Box, formula bar, grid, sheet tabs.
Sheets and tabs
Double-click the tab of Sheet1 to rename it. Type Budget, and press Enter.
On screen: Double-click Sheet1 → Budget ↵.
Right-click the tab for its menu: insert, rename, move, hide or delete a sheet, and choose a tab color. Choose Blue.
On screen: Right-click Budget → Tab Color: Blue.
The plus beside the tabs adds a sheet. Add one, and name it Assumptions. It will hold the inputs the budget uses.
On screen: + → double-click Sheet2 → Assumptions ↵.
Entering data
Type the first input. Double-click A1, type Mass allocation in kilograms, and press Enter. In B1, type twelve.
On screen: A1: Mass allocation (kg); B1: 12.
Back on the Budget sheet, type the column headings in row two: number, subsystem, mass, contingency, and mass with contingency. Enter confirms each entry.
On screen: Budget: A2 No., B2 Subsystem, C2 Mass, D2 Contingency, E2 With contingency.
Then the first subsystem: one point one, Payload Camera, an estimate of two point five kilograms, and a contingency of ten percent, typed as zero point one.
On screen: Row 3: 1.1, Payload Camera, 2.5, 0.1.
The other five subsystems are entered the same way.
On screen: Card while rows 4 to 8 are filled.
Formulas
Now a formula. Select E3, click the formula bar, and type equals C3 times, in brackets, one plus D3. Press Enter. The cell shows the result, and the formula bar keeps the formula.
On screen: E3 → formula bar: =C3*(1+D3) ↵.
The Name Box also selects. Type E3 colon E8, and press Enter. Then open Fill, and choose Fill Down: the formula is copied to every row, with its references adjusted.
On screen: Name Box E3:E8 ↵ → Fill ▾ → Fill Down.
In row nine, the total. Type Total in B9. In E9, start typing equals S U. Autocomplete lists the functions that match, with what each one does.
On screen: B9 Total; E9 =SU: the function list.
Click SUM. Holarch writes the name and the bracket, and the hint shows the arguments. Type E3 colon E8, close the bracket, and press Enter.
On screen: SUM → E3:E8) ↵.
Formulas can use other sheets. Type Allocation in B10, and in E10, equals Assumptions, exclamation mark, B1.
On screen: B10 Allocation; E10 =Assumptions!B1 ↵.
Last, the margin: what is left of the allocation, as a fraction of it. Type Margin in B11, and in E11, equals, in brackets, E10 minus E9, divided by E10.
On screen: B11 Margin; E11 =(E10-E9)/E10 ↵.
Every edit is one undo step, and the spreadsheet is saved with the project, as an item with its own history.
On screen: The budget so far.
Recap
To recap: rename tabs by double-clicking, color them from their menu, type in cells, write formulas in the formula bar, select ranges in the Name Box, and let autocomplete finish function names.
In the next chapter, you format the budget and lay it out.