Behavior · How-to
Build an Action Diagram
Model a functional flow with sequence, parallel paths, decisions and loops.
- Open Diagrams (bottom of the rail) → + New Diagram, pick Action Diagram and type the name of the parent action in Diagram of. For an existing Action, use its Open in ▾ → Action Diagram.
- Click + Add ▾ → + Action ▾ → New Action… to add steps in sequence. Each becomes a child (decomposed by) of the parent.
- From + Add ▾, add + Sync for parallel steps, + Or for a decision (set branch probabilities or conditions), + Loop for repetition and + Exit to end early.
- Show what passes between actions: select the producing action and click + I/O, then pick the receiving one, or drag the action's green handle onto the receiving action.
- Assign a performer in the action's Item View (performed by), or drag Performer from the palette onto a Parallel or SYNC branch. Drag Resource onto an action that consumes it.
- Set each action's Duration in the inspector; with several actions selected, the inspector's Duration (N Actions) sets it on all of them.
- Select an action and click Decompose to model its own sub-flow.
- The diagram checks badge lists unconnected items, actions without a Duration and decomposition cycles. Arrange ▾ → Generate Asset Diagram builds the physical view.
Related
Full documentation: Action Diagrams › Build a flow from scratch