Videos · Systems Engineering with Holarch
SE 06 - System Analysis: Budgets, Margins and Simulation
A power budget read from the components, battery autonomy as a TPMTechnical Performance Measure A key technical parameter, such as mass or power, tracked over time against its target and threshold., and a simulation of frost warning delivery against its requirement.
Episode 6 of the series (episodes 1 to 11). Plays from holarch.app; see the Privacy Policy.