Holarch

Control & Reviews · How-to

Produce a Review Package

Baseline the model and assemble the documents, report and slides for a design review.

  1. Baseline the project: Control & Reviews → Baselines & Versions → + Save Baseline…, type a name such as “PDR” and press Enter. Baseline each specification with Version ▾ → Save Baseline… in its title block, with the approvers.
  2. Write the review report as a document (Needs & Requirements → Documents → + New Document). Insert live diagram pictures and query tables with the rich-text editor's + menu (Diagram…, Live Table…).
  3. Open Control & Reviews → Reviews, click + New Review Package, and add each document with Add Document… on its card, or Insert Document… in the compilation.
  4. Export the package: in the compilation choose Deliver ▾ → Specification (Word) (or another Word template). Revision History and Approvals tables are filled from the baselines.
  5. Build the slides: Plan → Presentations → + New Presentation (start from a title slide or a document outline). Add slides with + New Slide ▾ (Item card and Diagram slides stay linked to the model) and pictures with Picture ▾ → Picture of….
  6. Present with ▶ Present ▾, or download PowerPoint, HTML or Word from Export… in the page header.
  7. Add the RVTM, ICDs and risk register exports as needed (each page's Export ▾).

Related

Reviews · Presentations · Baselines & Versions · Documents