Getting Started
Tutorials
Listen to this page 19 min
Eleven guided tutorials on a small Weather Station model, from the first requirement to a delivered specification, with a step panel that checks your work as you go.
On this page
- How to use it
- Tutorial 1: Getting Around
- Tutorial 2: Write Good Requirements
- Tutorial 3: Trace Requirements
- Tutorial 4: Functional Analysis
- Tutorial 5: From a Spreadsheet to Requirement Diagrams
- Tutorial 6: Physical Architecture and Allocation
- Tutorial 7: Interfaces
- Tutorial 8: Simulate the Functional Flow
- Tutorial 9: Verify the Requirements
- Tutorial 10: Baseline, Change, Impact
- Tutorial 11: Produce the Deliverable
- Tutorial projects and plan limits
- Related
Holarch has eleven guided tutorials. Each one creates a small starter project and opens a step panel beside the page. The panel checks the model as you work and ticks each step when it is done. This page lists every step as text, so you can also follow along here.
All tutorials use the same small system: WS-1 Weather Station, a solar-powered station that measures the weather, logs the readings and reports them to a server. Each tutorial has its own starter project, so you can take them in any order. Tutorials 6 to 11 carry the model forward: each starter project holds the Weather Station as the earlier tutorials left it.
| Tutorial | Time | You learn to |
|---|---|---|
| Getting Around | 10 min | use the rail, the Database, the inspector, search (⌘K / Ctrl+K) and Help |
| Write Good Requirements | 15 min | create a requirements document, add requirements, run the quality check and fix flagged wording |
| Trace Requirements | 12 min | link requirements to functions and components in the Traceability Matrix and find a gap |
| Functional Analysis | 15 min | derive functions from requirements, decompose a function and generate an FFBD |
| From a Spreadsheet to Requirement Diagrams | 20 min | import requirements from Excel, baseline them, fix what the quality check flags, draw and export spider and tree diagrams, add and label requirements |
| Physical Architecture and Allocation | 15 min | build the asset hierarchy, allocate functions to components and check the result with the Allocation Hierarchy |
| Interfaces | 15 min | connect subsystems with conduits, name what flows, add ports, read the interface register and export an ICD |
| Simulate the Functional Flow | 15 min | give functions durations, simulate the flow, find the longest path and check a timing requirement |
| Verify the Requirements | 15 min | choose verification methods, create test cases, record results, read the RVTM and close the gaps |
| Baseline, Change, Impact | 20 min | approve and baseline requirements, change one through a change request, mark the changed links reviewed and approve it again |
| Produce the Deliverable | 12 min | create a specification from a template, insert live matrices, baseline it and export it to Word |
How to use it
Start a tutorial
Start a tutorial from any of these places:
- Help → Tutorials in the rail.
- Manage Projects → Project Files ▾ → Start a Tutorial…, or Start a Tutorial when you have no projects yet.
- Search (⌘K / Ctrl+K): type
tutorialand choose Start a Tutorial… or one tutorial by name.
On the Tutorials page, click Start on a tutorial card. You see the new project, named Tutorial: <name> (Weather Station), with the step panel on the right.
Follow the steps
- Read the current step in the panel. It is the first step without a tick.
- Click Show Me to outline the control the step needs. The outline fades after a few seconds and never blocks the page.
- Click Go There when the step works on another page.
- Do the step in the normal Holarch window. The step turns green as soon as the model meets it. The next step opens.
- Click Read more for the matching Help topic or Docs section.
The panel stays docked on every page of the tutorial project. Click › in its header to collapse it to a narrow strip, and click the strip to bring it back.
Watch the video
A tutorial with a video shows its picture with ▶ on its card on the Tutorials page, and ▶ in the panel header. Click either one to play the video in a dialog. It plays from holarch.app with captions off; turn them on with the player's captions control. Where the video has narration in your interface language, it plays in that language (the picture stays the same); Audio under the video switches to another language, keeping your place. The captions control lists every language the video has captions in. A video without narration in your language plays in English. Nothing loads before you click; see the Privacy Policy. In the desktop version the video opens on holarch.app in a new tab. Every tutorial has a video, and works without it.
Help → Videos lists the tutorial videos, the tours (short overviews of groups of features on the CubeSat EO-1 demo project) Building a CubeSat in Holarch, a series that builds the CubeSat EO-1 model step by step from the mission concept to verification, and Systems Engineering with Holarch, a series that follows the ISO/IEC/IEEE 15288 technical processes on the WS-1 Weather Station, and the feature highlights, short clips of one feature each; the same videos are on the Videos page, and each highlight also plays on its Features page. Every video plays from holarch.app, with captions (in the desktop version it opens there in a new tab). Help topics with a matching tour show ▶ Watch the tour, topics with a highlight show ▶ Watch: and the clip's name, and a new or nearly empty project shows New to Holarch? ▶ Watch the 4-minute tour on Home until you close it with ×.
Resume, restart or finish
- Resume: open the tutorial project again, or click Resume on the Tutorials page. Progress is saved in the project, so it also resumes in another browser.
- Restart: click Restart… in the panel or on the card. Holarch deletes the tutorial project and creates a fresh one.
- Mark as Done: click Mark as Done in the panel when the steps are done. The card on the Tutorials page shows Done. The project stays; delete it from Manage Projects when you no longer need it.
- Close: × in the panel header hides the panel for this project. Click Resume on the Tutorials page, or run Show Tutorial Panel from ⌘K / Ctrl+K, to show it again.
Each card on the Tutorials page shows Not started, In progress (with the steps done) or Done, and links to Steps as text on this page. A finished tutorial's card has Open instead of Resume.
Tutorial 1: Getting Around
Learn the parts of the Holarch window on a finished Weather Station model. The starter project has a requirements document, four functions and four components.
- Open the model database. Click Database at the bottom of the rail. Every item in the project is listed in one table.
- Use the inspector. Click the row Sensor Suite. In the inspector on the right, change Name in the first group (Definition) to
Sensor Package. The new name is saved at once. Every page shows it. - Search with ⌘K / Ctrl+K. Press ⌘K / Ctrl+K (or click Search in the top bar). Type
Data Loggerand press Enter. The item opens on its own page. - Create an item from search. Press ⌘K / Ctrl+K, type
new reqand choose New Requirement…. Enter the nameMeasure Wind Speedand the descriptionThe station shall measure the wind speed to within 0.5 m/s.Click Create. - Open a lifecycle group. Click Behavior in the rail. The overview page shows the group's pages and live numbers.
- Open the requirements document. In the rail, open Needs & Requirements → Documents, then click Weather Station Requirements.
- Open Help for the page. Click ? in the top bar, or press ? outside a text field. Help opens the topic for the page you are on, beside the page.
Tutorial 2: Write Good Requirements
Write requirements, check them against the requirement-writing rules, and fix what the check flags. The starter project has the Weather Station components but no requirements yet.
- Create a requirements document. Open Needs & Requirements → Documents and click + New Document. Enter the name
Weather Station Requirements, keep Blank and click Create. - Add four requirements. In Quick add below the document, type each line and press Enter:
The station shall measure air temperature and report humidity quickly.The station shall store measurements as needed.The station should be easy to install.The station shall transmit the weather report to the server at intervals of 10 minutes.
- Run the quality check. Open Needs & Requirements → Quality. Set the scope to Document: Weather Station Requirements and click Check Quality. Each requirement gets a score. The Suggestions column says what to fix.
- Split the combined requirement. The first requirement states two actions (measure and report), so it fails Singular. Open the document, select the first requirement and change its Description in the inspector to
The station shall measure the air temperature to within 0.5 °C.Then addThe station shall measure the relative humidity to within 3 %.with Quick add. - Replace vague wording. Change the description of the second requirement to
The station shall store the measurements of the last 30 days.Change the third toThe installer shall mount the station on the mast in 30 minutes.The step turns green when no requirement in the document fails Unambiguous. - Check again. On the Quality page, click Check Quality again. Every requirement now scores 67% or more. Correct and Feasible need a reviewer's judgment, and Verifiable needs a test, so 67% is the best a requirement can reach before it is reviewed and verified.
Tutorial 3: Trace Requirements
Link requirements to the functions and components that satisfy them, read the matrix, and find what is missing. The starter project has six requirements, four functions and four components. Five requirements are already linked to functions.
- Open the Traceability Matrix. Click Go There in the step, or open Verification → Traceability Matrix. Click the Rows chip, set Rows from to All entities of a class and Class to Requirement, and click Done. Do the same with the Columns chip for Action. Each mark is a relationship between a requirement (row) and a function (column).
- Find and close the gap. Tick Gaps only. One row is left: Report Battery Level; no function satisfies it. Click the cell where it meets F4 Manage Power and choose satisfied by if Holarch asks. The row leaves the gap list. Untick Gaps only.
- Link a requirement to a component. Set the Columns chip's class to Asset. Click the cell where Store Measurements meets Data Logger and choose satisfied by.
- Allocate functions to components. Set the Rows chip's class to Action and keep the columns on Asset. Link each function to the component that performs it, with performed by:
- F1 Measure Weather → Sensor Suite
- F2 Log Measurements → Data Logger
- F3 Report Weather → Radio Link
- F4 Manage Power → Power Subsystem
- Read the trace on the item page. Press ⌘K / Ctrl+K, type
Report Battery Leveland press Enter. Its Trace section shows that F4 Manage Power satisfies it. - Follow the trace to the component. Click F4 Manage Power in the Trace section, then click Power Subsystem under performed by. You followed the chain requirement → function → component.
Tutorial 4: Functional Analysis
Derive functions from the requirements, decompose one of them, and draw the functional flow block diagram (FFBD). The starter project has a requirements document with four functional requirements and two performance requirements, and no functions yet.
- Open Functional Analysis. Open Behavior → Functional Analysis. Set the scope to Weather Station Requirements.
- Extract the functions. On the Functions tab, click Extract by Rules…. Review the preview and click Apply. Holarch creates a top-level function with one function per functional requirement (F1–F4) and links each requirement to its function with satisfied by.
- Rename the top-level function. Click the top-level function's name next to Top-level function:. Change its Name to
Operate Weather Station. - Decompose a function. Open F1 Measure Weather (search with ⌘K / Ctrl+K). In its Trace section, click the + beside decomposed by (tick Show all relations if it is not listed), choose New Action… and create the Action
Read Sensors. Do the same forCheck Readings. F1 now has two sub-functions. - Arrange the flow. Go back to Functional Analysis and open the Flow & FFBD tab. Click Edit as Text…, enter
AND(LOOP(F1 -> F2 -> F3) | F4)and apply it. Measuring, logging and reporting now repeat in a loop while power management runs in parallel. - Open the FFBD. Click Open FFBD. The diagram shows the loop (LP) and the parallel branch (AND).
- Change the layout. In the FFBD toolbar, set the orientation to Top down.
- Open the sub-function's FFBD. Double-click F1 Measure Weather in the FFBD. Its own FFBD opens with Read Sensors and Check Readings.
Tutorial 5: From a Spreadsheet to Requirement Diagrams
Bring requirements from a spreadsheet into Holarch, check and improve them, and draw the diagrams that show their structure. The tutorial project starts empty.
- Get the spreadsheet. Click Download Spreadsheet in the step, or download weather-station-requirements.xlsx (CSV version). To make your own in Excel or any spreadsheet app, put these columns in the first row:
- Number: the outline number, such as
1,1.1,1.2. - Name: a short name.
- Description: the requirement statement, such as
The weather station shall …. - Class:
Statementfor a group heading (1 Sensing),Requirementfor the rows under it (1.1,1.2). Holarch reads Excel files directly; no need to save as CSV. The sample file has four weak requirements on purpose.
- Number: the outline number, such as
- Import it. Open Needs & Requirements → Import and Export and drop the file on the page. Click Continue twice to reach Review, then click Import N items. Holarch matches the columns by their names and nests each requirement under its Statement by number. The requirements document opens.
- Create a baseline. In the document, click Version ▾ in the title block and choose Save Baseline…. Name it
Baseline 1and click Create. The baseline keeps this first version, so you can compare later changes with it. - Run the quality check. Open Needs & Requirements → Quality, set the scope to the document and click Check Quality. Click Export ▾ → Excel (.xlsx) to keep the report. Read the levels: automated checks reach at most 78%. 67% or more means the requirement passes every wording rule. Below 67%: rewrite it.
- Fix the flagged requirements. Select each requirement below 67% in the document and change its Description in the inspector. Run the check again until each one reaches 67%. Correct and Feasible need your own review: after checking, click their ✘ to mark Yes, which raises the score to 89–100%. For example:
- 1.2:
The weather station shall measure the wind speed to the nearest 0.1 m/s. - 1.3:
The rain gauge shall record each 0.2 mm of rainfall. - 2.3:
The display shall show the latest readings. - 3.2:
The weather station shall send the low-battery alert at 20 % charge.
- 1.2:
- Create and export the spider diagram. Open Diagrams in the rail. Cards marked Derived view are diagrams Holarch offers for every top-level entity with children (see Diagrams); opening one saves it. Create the spider yourself, as you would for any entity: click + New Diagram and choose Spider Diagram. In Root, type
Weather Station, pick the document Weather Station Requirements and click Create.- The spider follows the relationships ticked in the inspector's Chart section (Relationships… in the toolbar moves to it), here source of (the document to its Statements) and decomposed by (each Statement to its requirements).
- Level sets how many steps out from the root it goes. Changes to either apply at once.
- Click Export… in the diagram toolbar and choose Diagram (PNG) or Diagram (SVG).
- Open and export the tree diagram. Diagrams also open from the document. Open Weather Station Requirements; if an item is selected, press Esc so the tree starts at the document. Click View ▾ in the document toolbar and choose Open In ▸ Tree. The tree shows each Statement with its requirements under it. Click Export… and choose a format.
- Add a requirement in the Database. Open Database and click + New Item. Choose Requirement, name it
Maximum Wind Speed, number it1.2.1and describe it asThe weather station shall report wind speeds up to 150 km/h.In the inspector's Trace section, click + beside decomposes, choose Link existing…, tick 1.2 and click Link Selected. Open the document: the new requirement sits under 1.2. - Label the requirements. Open Needs & Requirements → Requirements. Tick 1.1 to 3.2 and click Label ▾ → Functional Requirement. The rows stay ticked: click × at the end of the selection bar (or press Esc) to clear them, then tick 1.2.1 and choose Label ▾ → Performance Requirement. One click labels every ticked requirement.
- Move between views and projects. Open the document from Needs & Requirements → Documents, then the Database: both show the same items. Open Manage Projects, open another project, then come back to this one with the project name in the top bar.
Tutorial 6: Physical Architecture and Allocation
Build the physical side of the Weather Station and say which component performs each function. The starter project has the requirements, the functions F0–F4 (F1 decomposed into Read Sensors and Check Readings) and the flow from tutorial 4, and the system WS-1 Weather Station with no parts yet.
- Open the Asset Diagram. Open Architecture → Asset Diagrams and click + New Diagram. Choose Asset Diagram, pick WS-1 Weather Station in Root and click Create. The system is alone on the diagram.
- Add the subsystems. Drag Asset from the palette onto the diagram, enter the name of a subsystem and click OK. Each one becomes part of WS-1 (decomposed by). Arrange ▾ → Tidy Layout lines them up:
Sensor SuiteData LoggerPower SubsystemRadio Link
- Decompose a subsystem. Drag Asset from the palette into the Sensor Suite box, name it
Temperature Sensorand click OK. Do the same forHumidity Sensor. An asset dropped into a box becomes its child. - Allocate the functions. Click Go There in the step to open the Traceability Matrix with functions as rows, assets as columns and performed by as the relationship. Click the cell where each function meets its performer:
- F0 Operate Weather Station → WS-1 Weather Station
- F1 Measure Weather → Sensor Suite
- F2 Log Measurements → Data Logger
- F3 Report Weather → Radio Link
- F4 Manage Power → Power Subsystem
- Allocate the sub-functions. In the same matrix, link F1.1 Read Sensors to Temperature Sensor and F1.2 Check Readings to Data Logger. Check Readings runs on the logger, so the measuring function now spans two subsystems.
- Open the Hierarchy Diagram. Open Diagrams, click + New Diagram and choose Hierarchy Diagram. In Root, pick WS-1 Weather Station and click Create.
- Apply the Allocation Hierarchy. Click Configure in the diagram toolbar. In Options, click the preset Allocation Hierarchy (see Allocation Hierarchy preset). Each subsystem lists the numbers of the functions it performs, with its components below it.
- Check the allocation. Read the diagram: every function number appears under a subsystem, and F1.2 sits under Data Logger while its parent F1 sits under Sensor Suite. A function split across subsystems means data crosses between them; that is the interface of tutorial 7. Open Verification → Model Checks and confirm that no rule reports Actions no asset performs.
Tutorial 7: Interfaces
Connect the subsystems, say what flows between them and produce the interface control document (ICD). The starter project has the asset hierarchy and the allocation from tutorial 6, and no connections.
- Open the Asset Diagram. Open Architecture → Asset Diagrams and click + New Diagram. Choose Asset Diagram, pick WS-1 Weather Station in Root and click Create.
- Draw a conduit. Click ⋯ (More actions) in the diagram toolbar, then + Conduit. Set From Asset to Sensor Suite, To Asset to Data Logger and Name to
Sensor Bus, then click Create. You can also drag from a box's green dot to another box. - Connect the other subsystems. Add two more conduits the same way:
- Data Logger → Radio Link:
Serial Link - Power Subsystem → Data Logger:
Power Harness
- Data Logger → Radio Link:
- Say what flows. Click the Sensor Bus line. In its panel, click + Transfers I/O…, then Create New…, and create the Input/Output
Sensor Readings. Do the same on Serial Link withWeather Report. - Agree the interface. With Sensor Bus selected, open its attributes in the inspector. Set Interface Status to Agreed and Latency to
1Seconds. - Add ports. Open Architecture → Block Diagrams and click + New Diagram. Choose Internal Block Diagram, pick WS-1 Weather Station in Root and click Create. In the palette, type
Sensor Outin Add or find… and drag "Sensor Out" as Port onto Sensor Suite. Then typeSensor Inand drag "Sensor In" as Port onto Data Logger. - Read the interface register. Open Interfaces → Interface Register. Each conduit is a row with its ends, what it transfers and its status. Click the Agreed card to list only the agreed interfaces.
- Export the ICD. Open Interfaces → ICDs and click + New Diagram. Choose Interface Control Diagram, pick Sensor Bus in Root and click Create. Click Export ICD Document to save the interface control document for Word.
Tutorial 8: Simulate the Functional Flow
Give the functions durations, run the flow from tutorial 4 and find what sets the total time. The starter project has the flow AND(LOOP(F1 -> F2 -> F3) | F4) from tutorial 4 and the allocation from tutorial 6.
- Open the Action Diagram. Open Behavior → Action Diagrams and click F0 Operate Weather Station. A loop of F1 → F2 → F3 runs beside F4 in a parallel branch.
- Give each function a duration. Select each function and set Duration in its attributes in the inspector. F1 Measure Weather is decomposed, so its time is the time of its sub-functions: set theirs instead (double-click F1 to open its diagram).
- F1.1 Read Sensors: 15 Seconds
- F1.2 Check Readings: 5 Seconds
- F2 Log Measurements: 5 Seconds
- F3 Report Weather: 2 Minutes
- F4 Manage Power: 10 Minutes
- Set the loop count. Select the LOOP box. In its panel, keep Repeat while on Iterations and set the count to
3. - Run the simulation. Click ▶ Simulate ▾ → Discrete Event. On the Simulator page, click ⏩ Run to End. The summary shows Total time: 10 min. Holarch saves the run under Saved Results ▾.
- Find the longest path. Read the Timeline. The two branches start together, and the cycle ends when the slower one ends: the loop takes 7.25 min (three passes of 2 min 25 s), Manage Power takes 10 min. Manage Power is on the longest path, so it sets the total time. Change its Duration to
5Minutes. - Run it again. Run to the end again. The total time drops to the loop's 7.25 min. The loop is now the longest path, and shortening Manage Power further changes nothing.
- Check a timing requirement. Set F3 Report Weather's Duration to
=triang.dist(1, 4, 2)Minutes, so each report takes between 1 and 4 minutes. On the Simulator, switch to Monte Carlo and click ▶ Run Monte Carlo. Click Check Against Requirement…, choose Total time, ≤10Minutes and the requirement Transmit Weather Report, then Record Result… and Apply. Holarch records the result in a test case that verifies the requirement (see Simulation).
Tutorial 9: Verify the Requirements
Plan how each requirement is verified, record the results and close the gaps the RVTM shows. The starter project has the requirements with methods and test cases for requirements 1 to 3 only.
- Open the Test Center. Open Verification → Test Center. Verification Coverage lists each requirement with its method and its test cases.
- Choose the verification methods. In Verification Coverage, click the method letters (Analysis, Demonstration, Inspection, Test) for the requirements without one:
- 4 Transmit Weather Report: T
- 5 Operate on Solar Power: A
- 6 Report Battery Level: I
- Read the RVTM. Open Verification → RVTM. The cards count the requirements by status: two Passed, one Not Run, three Planned-only (a method but no test). No test in Verified by marks each gap.
- Close the gaps. Back in the Test Center, click + Test Case on the rows of requirements 4, 5 and 6. Each new test case verifies its requirement and starts as Not Run.
- Record the results. Set each test case's Status: click the status in its row and choose a value. The tests of requirements 3, 5 and 6 pass: choose Passed. The first report of requirement 4 came after 12 minutes, so its test fails: choose Failed.
- Fix and test again. The radio's report timer was fixed. Run the failed test again and set it to Passed. The RVTM now shows every requirement Passed.
- Export the RVTM. On the RVTM page, click Export ▾ → Excel (.xlsx).
Tutorial 10: Baseline, Change, Impact
Put the requirements under control, change one the controlled way and deal with what the change touches. The starter project has the verified model from tutorial 9, with conduits and test cases.
- Approve the requirements. Open Weather Station Requirements. Select each requirement and click Approve in the Approval box of the inspector. A later text change sends an approved requirement back to review.
- Set up change control. Open Control & Reviews → Change Requests. In Settings, tick Authors may approve their own change requests: you work alone in a tutorial project. In a team, another owner or a change board approves, and Changes to approved and baselined items require a change request is usually on as well.
- Baseline the project. Open Control & Reviews → Baselines & Versions. Click + Save Baseline… in the page header, enter
SRRand click Save Baseline. The baseline keeps the whole model as it is at the System Requirements Review. - Request a change. The customer wants a report every 5 minutes. On Change Requests, click New Change Request, enter the title
Report every 5 minutesand the reasonCustomer asks for faster reports.and click Create. - Stage the change and its impact. Click Add Change ▾ → Change an Item…, pick 4 Transmit Weather Report and change its description to
The station shall transmit the weather report to the server at intervals of 5 minutes.Click Stage Change. Under Affected Items, the impact list suggests the items traced to it; click + beside F3 Report Weather and its test case. Click Submit for Review. - Approve and apply. Click Approve… and confirm (on the hosted service, Holarch asks for your password first). Then click Apply Changes. Holarch applies the staged change and marks the request Implemented; a single Undo takes it all back.
- Find the links to review. Open Needs & Requirements → Links to Review. The new text marks the links of requirement 4 for review: what satisfies and verifies it may no longer fit. Requirement 4 is back In Review.
- Review and mark them reviewed. Click Diff to see what changed. F3 still satisfies the requirement, and its test needs a new run. Click Mark All Reviewed…, enter the comment
F3 checked; test re-run planned.and click Mark Reviewed. - Approve it again. Open requirement 4 and click Approve again. It is in the SRR baseline, so a dialog lists the items that trace to it; click Approve there. Open Baselines & Versions and click Compare on SRR to see the change since the baseline.
Tutorial 11: Produce the Deliverable
Turn the model into a specification that stays current, then freeze and export it. The starter project has the verified model; one test case (requirement 5) has not run yet.
- Create the specification. Open Needs & Requirements → Documents and click + New Document. Name it
WS-1 System Specification, choose the template Requirements Specification and click Create. The template gives the sections and writing guidance. - Insert a live RVTM. Select section 11 Verification Approach. Click Write ▾ → Insert ▸ Matrix…, choose Requirements Verification Traceability Matrix (RVTM), set the scope to Weather Station Requirements and click Insert. Click ✓ (Save) in the editor toolbar to save the section.
- Insert the allocation matrix. Select section 3 System Overview and insert the Allocation Matrix (functions to components) the same way. It shows the allocation from tutorial 6.
- Watch it update. Open Verification → Test Center and set Verify Operate on Solar Power to Passed. Go back to the specification. Requirement 5 in the RVTM now reads Passed: the matrices follow the model.
- Baseline the document. In the specification, click Version ▾ in the title block and choose Save Baseline…. Name it
Issue 1and click Create. - Export to Word. Click Deliver ▾ and choose Specification (Word). The Word file has the sections, the matrices as tables and the title block. Deliver ▾ → Print or PDF… makes a PDF the same way.
Tutorial projects and plan limits
- Tutorial projects do not count toward the Free plan's 5 active projects.
- Each tutorial project holds up to 300 items.
- You can have one tutorial project per tutorial. Restart… replaces it.
- Tutorial projects are personal: you cannot add editors or transfer them. You can invite viewers. For example, a student can share a tutorial project with an instructor as a viewer.
- Attachments in a tutorial project count toward your storage like any other file.